The Cost of Building an ADU in Los Angeles
So, you’re thinking about building an Accessory Dwelling Unit (ADU) in Los Angeles? Whether you’re planning a backyard rental, a cozy guest house, or a home office, an ADU is a solid investment. But let’s get real—the price tag is the big question.
The cost to build an ADU isn’t just about throwing up some walls and calling it a day. It involves construction permits, foundation work, and a whole lot of decisions that can make or break your budget. So grab your blueprints, and let’s break down what it actually costs to build an ADU in LA (without breaking the bank).
1. The Base Cost – What’s the Damage?
The average cost to build an ADU in Los Angeles ranges from $150,000 to $400,000+, depending on size, design, and materials. On a cost-per-square-foot basis, you’re looking at $300–$600 per sqft—sometimes more if you go high-end.
Why the big range? Because custom home builders and contractors price their work based on factors like:
✅ Size & layout (studio vs. 2-bed ADU)
✅ Type (garage conversion, detached, attached)
✅ Framing and structural work
✅ Level of finishes (basic vs. luxury)
✅ Site conditions (we’re looking at you, expansive soils 👀)
If you’re doing a garage conversion, your costs could be as low as $80,000-$150,000. If you’re building a brand-new detached ADU, expect costs to climb toward $300K+.
2. Permits & Paperwork – Because LA Loves Red Tape
Before you can even think about pouring ready mix concrete for your foundation, you need to deal with the City of LA’s permitting process.
💰 Permits & Fees: Expect to spend $5,000–$15,000 on:
✅ Plan check fees
✅ BIM (Building Information Modeling) & CAD (Computer-Aided Design) fees
✅ GFCI (Ground Fault Circuit Interrupter) requirements
✅ Fire-resistive materials for safety
✅ Environmental impact fees (especially for green building compliance)
And let’s not forget about change orders—those unexpected adjustments that always pop up mid-project, adding both time and cost.
3. Site Prep & Foundation – What’s Underneath Matters
Once your permits are in hand, it’s time to prepare the site. This can be easy… or a money pit, depending on what’s under your future ADU.
🚜 Common site prep costs:
✅ Grading the land ($3,000–$10,000)
✅ Damp proofing & drainage ($2,000–$5,000)
✅ Foundation costs ($10,000–$25,000)
✅ Dealing with expansive soils (can add thousands to flatwork & floating slabs)
If your site is on a slope, expect extra costs for footers (footing) and retaining walls. If you need a new sewer or electrical line, that’s another $5,000–$15,000.
4. Framing, Roofing & Exterior – The Skeleton of Your ADU
After the site is ready, the construction company moves on to framing—aka, putting up the bones of your ADU.
🔨 Framing & Exterior Costs:
✅ Framing & fascia work ($30,000–$50,000)
✅ Girder trusses & glulam beams ($5,000–$15,000)
✅ Windows & doors ($5,000–$20,000)
✅ Flashing & roofing ($7,000–$20,000)
Want something energy-efficient? Consider passive house techniques like airtight insulation and solar-ready roofs.
5. Interior Finishes – Where the Magic Happens
Now comes the fun part—choosing the finishes! But don’t get too carried away at Home Depot because these costs add up fast.
🎨 Interior Finish Costs:
✅ Felt (underlayment) & flooring ($5,000–$15,000)
✅ Drywall & paint ($5,000–$10,000)
✅ Kitchen ($10,000–$30,000)
✅ Bathroom ($10,000–$25,000)
✅ Electrical & plumbing ($15,000–$30,000)
If you want high-end finishes, it’ll cost more. Need to upgrade your HVAC? That’s another $7,000–$15,000 for forced air heating/cooling.
6. Utilities & Hookups – The Hidden Costs
Connecting your ADU to water, gas, and electricity isn’t free. If your lot isn’t already ADU-ready, expect to pay extra for utility connections.
💡 Utility Connection Costs:
✅ Electrical panel upgrade ($2,000–$5,000)
✅ Sewer & plumbing work ($5,000–$15,000)
✅ Gas line extension ($2,000–$10,000)
These numbers depend on how far your ADU is from existing hookups. The farther away, the more trenching and labor you’ll pay for.
7. The Final Costs – What’s the Grand Total?
When all is said and done, here’s a rough breakdown of what you might spend:
Garage Conversion ADU → $80,000 – $150,000
Attached ADU → $150,000 – $300,000
Detached ADU → $200,000 – $400,000+
Want to save money? Consider prefab ADUs or design-build teams that streamline the process.
Final Thoughts – Is It Worth It?
Absolutely. With rental income potential of $2,000–$3,500 per month, an ADU in LA pays for itself over time. Plus, it adds equity to your property.
If you’re ready to start, get a bid from a trusted general contractor who understands cost codes, cost-plus contracts, and daily reports to keep your budget in check.
Thinking about an ADU? Start with floor plans, run the numbers, and get ready to turn that backyard into an income-generating powerhouse! 🚀